2022–2023 · The Wanderlust Group
Scaling Systems, Marina Map
Rolling out and scaling the Marina Map feature: the operational system behind delivery.
- Role
- Product Design Manager
- Scope
- Two-phase delivery system behind Marina Map's rollout to 208 marinas
- Outcome
- Cut the 'In Design' phase from 22 days to 5, a 77% reduction
22 → 5
Days in the "In Design" phase
77%
Faster map delivery
208
Marinas served by this pipeline
/ THE PROBLEM
The Marina Map MVP shipped with heavy manual processes to hit the timeline. As map requests climbed, those manual steps (no customer directions, ad hoc handoffs, no delivery-time estimates) became the bottleneck, and Product Design was spending about 35 hours a week creating maps in Figma.
/ WHAT I DESIGNED
A two-phase delivery system: first, automation and outsourced asset creation with a Slack-triggered handoff; then a consolidated JIRA workflow with an embedded design agency and a company-wide SLA.
/ HOW I PROVED IT
The internal 'In Design' phase (asset collection to a live map) dropped from 22 days to 5, a 77% cut, letting the feature scale to 208 marinas without scaling headcount.
/ The Long Version
Read the full case study